Run step
Step 10: tool results
add_relationship_edge
Input
{
"child_id": "1d21c694-7f35-4518-ba59-770d0cfef986",
"relation": "supports",
"parent_id": "50758adb-ea92-4663-adb8-70d8985d4ebd",
"reasoning": "If the p50 estimate itself becomes unreliable at long horizons on the current task suite, a single p50 figure is a weaker basis for forecasting, strengthening the case that it needs supplementing.",
"argument_id": "85d9ddb6-6478-488a-b112-491af2d834a1"
}{"success":true,"message":"Linked existing claim 1d21c694-7f35-4518-ba59-770d0cfef986 as a subclaim of 50758adb-ea92-4663-adb8-70d8985d4ebd (supports). Grouped it under argument \"The argument from information lost by a one-point summary\".","child_claim_id":"1d21c694-7f35-4518-ba59-770d0cfef986","relationship_id":"65e3725b-b7f6-407e-a936-cca1b6eea53f","created":true,"argument_id":"85d9ddb6-6478-488a-b112-491af2d834a1","grouped":true}add_related_claim
Input
{
"kind": "related",
"claim_id": "50758adb-ea92-4663-adb8-70d8985d4ebd",
"reasoning": "The doubling-time forecast is the main forecasting use of the p50 horizon whose adequacy this claim questions.",
"other_claim_id": "b5ba920f-ea97-4b56-a7eb-33af9e2ecf8e"
}{"success":true,"linked":true,"link_id":"6158a8db-71ed-4cc0-95c5-db6d6d53e0d8","message":"Linked 50758adb-ea92-4663-adb8-70d8985d4ebd <-> b5ba920f-ea97-4b56-a7eb-33af9e2ecf8e (related); it now shows as a see-also on both claims."}add_related_claim
Input
{
"kind": "related",
"claim_id": "50758adb-ea92-4663-adb8-70d8985d4ebd",
"reasoning": "Run-to-run variance is part of the reliability information a single p50 horizon omits.",
"other_claim_id": "9493359e-c047-4b55-a8bb-be6049818df6"
}{"success":true,"linked":true,"link_id":"5af649ac-c349-4cef-a015-3ab144972490","message":"Linked 50758adb-ea92-4663-adb8-70d8985d4ebd <-> 9493359e-c047-4b55-a8bb-be6049818df6 (related); it now shows as a see-also on both claims."}